Display Time/Frequency Step
Control which time or frequency step is displayed for dynamic response data.
- In the Project Tree, click on a dynamics analysis branch to open the Analysis Workbench.
-
On the Analysis Workbench
toolbar, click
Results plot.
-
Choose the desired results type from the menu.
The Dynamic time response and Legend dialogs will open. The initial display will be set to the peak value time step.
-
In the Dynamic time response dialog, click the
(Start Animation) button to display all time/frequency steps.
- Use the Animation time span field to narrow the animation range.
-
Move the slider to select a new starting point for the animation.
You can also use the Elapsed time field to select a start time.
- To return to the initial time step, click Show at peak.
- Click Close.