Scatter Plots

Plot exploration inputs and outputs.

  1. From the Design Explorer ribbon, Evaluate tool group, click the Results Explorer tool.

    The Results Explorer browser opens.
  2. In the Results Explorer browser, click the Scatter Plot icon .
  3. Select the desired X-axis value and the desired Y-axis value(s).
  4. Optional: Select constraints to plot as datum lines.
    Note: Checking Show Violated will color plot points red where corresponding runs violate the given constraint.