Scatter Plots

Plot exploration inputs and outputs.

  1. From the Design Explorer ribbon, Evaluate tool group, click the Results Explorer tool.

    Tip: To find and open a tool, press Ctrl+F. For more information, see Find and Search for Tools.
    The Results Explorer browser opens.
  2. In the Results Explorer browser, click the Scatter Plot icon .
  3. Select the desired X-axis value and the desired Y-axis value(s).
  4. Optional: Select constraints to plot as datum lines.
    Note: Checking Show Violated will color plot points red where corresponding runs violate the given constraint.