Revise

Design revision is available when a PCB design is completed.

Before revise a design, you needs to enter the type and information of the revision. The major revision is changed when a revision is started. (For example, from 1.02 to 2.00, from 2.03 to 3.00)


Figure 1.
In the revise page, enter the revise information.
  • Design project revision
    • Customers who are using the corporate system can enter the system's design project revision to match it.
  • Revise Condition
    • Select the condition of the revision.
    • Unnecessary processes can be skipped and proceeded quickly depending on the option.
  • Revision comment
    • Enter comments for the revision.