PCB Verification

If there is a PCB verification process in the design project, the verification will be performed automatically after generating PCB outputs.

However, the verification conditions should be set in the process settings when registering the design project.

After the verification is completed, the status is changed.

  • Click to display the PCB design. PollEx PCB will be invoked to display the design.
  • Click to display the rule information of verification criteria.
  • Click to display the DFM verification results. PollEx PCB will be invoked and display the results.
  • Click to re-run the verification.
  • Click to check the verification results (Fail List).
  • DFE, DFA and DFE+ are the same as DFM.
  • If you want to stop the re-run, click during the re-run.