Duty cycle
User working point(s) analysis = Duty cycle
This allows computing the machine performance all over a considered duty cycle.
This duty cycle must be defined by using the next field: "Duty cycle description" and by clicking on the button "Set values".
Two ways are possible to fill in the table: either filling in the table line by line
or by importing an excel file which all the working points of the duty cycle are
defined.
Note: A working point is defined by a time, a
speed, and a mechanical torque.
|
|
User working point analysis = Duty cycle | |
1 | Select the “Duty cycle” option |
2 |
Click in the button “Set values” of the field “Duty cycle” to open a dialog box to define the duty cycle. Refer to the next illustration which shows how to fill the Duty cycle table. |
3 | Button to validate the user input data |
4 | Button to run the computations |
Note: Once the test results have been computed, new user working
point and duty cycle values can be set, and results will appear instantaneously when
relaunching the test.
|
|
User working point analysis = Duty cycle – Dialog box to define the duty cycle | |
1 | Dialog box opened after having clicking the button “Set values” in the field “Cycle description”. |
2 | Browse the folder to select an Excel file which is described the duty cycle. |
3 | Button to refresh the table data when the considered Excel file has been modified. |
4 | Fields to be filled with data to describe the duty cycle to be considered. |
Note: The Excel template used to import a duty cycle is stored in
the folder Resource/Template in the installation folder of FluxMotor®. An example of
this template is displayed below.
|
Excel file template to define the duty cycle |