Validation of COG

In BOM Management COG validation works based on the limit defined in XYZ limit tab geometrical reference.

User can define calculated COG value based on mode

  • Global Mode
  • LCG Mode
  • Frame
  • MVZ
  • VCG Mode
  • Deck
Again, each mode internally has 3 sub-sections (Blank, Manual, Room, MVZ)