E-BOM List Menu
Edit the master BOM.
: Click to display the design project information.
Figure 1.: Select the sorting criteria.
- Sort by reference: Sort the BOM list by the reference
designator.
Figure 2. - Sort by part number: Sort the BOM list by the part number.
Figure 3.
- Sort by reference: Sort the BOM list by the reference
designator.
: Category for priority sorting to see errors.
- Changed part (before application): Give priority to the changed part.
- Lock part Library: Give priority to the locked part.
- CPN not found: Give priority to the part which doesn’t have a CPN.
- Different part information compared to UPMS: Give priority to the part which has different properties to the part in UPMS.
- The part included verification fail: Give priority to the part that failed verification.
- Click Sorting to sort with the selected condition.
: Edit
- In this menu, you can add, change and delete parts and can add and edit parts which are not included in the design.
Figure 4.
Part Change
When changing a part, only part with the same footprint is listed in the list.

Figure 5.
If there are variants, then you can select the variants to reflect.
- Select variants: Apply to the selected variants.
- ALL: Apply to all including the master.
- ONLY MASTER: Apply to the master only.
- CANCEL: Cancel to change.
Setting Not Used Part on Variant

Figure 6.
Add Mechanical Part

Figure 7.

Figure 8.

Figure 9.
Modify Mechanical Part

Figure 10.
Delete Mechanical Part
When deleting, select the application type and proceed the same as the part change.

Figure 11.
Alternative Part

Figure 12.

Figure 13.

Figure 14.
: Export to Excel
- All: Export all list to an excel file.
- Compare (Derivation):Export the different items only.
: Unit price calculation. By using the unit price calculation menu, you can estimate the total cost.
Figure 15.
Figure 16.