Running a Log Clearance Task

When you finish configuring a log clearance task, you can run it to perform the specified action, in the same way as you assign a maintenance task.

To run a log clearance task

  1. Configure a maintenance process.

NOTE: If the desired maintenance process already exists, skip down to step 2.

  1. Assign the log clearance task to the maintenance process, in the same way as you assign a maintenance task.

  2. Run the maintenance process. When the process is executed, the tasks assigned to it will be run as well.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(c) 2023 Altair Engineering Inc. All Rights Reserved.

Intellectual Property Rights Notice | Technical Support